Projects

Greater Springfield Habitat for Humanity (GSHFH) builds new houses and repairs homes in need of modifications, weatherization, yard cleanup, and landscaping. 

CURRENT PROJECTS.

Bay Street, Springfield

3 bedrooms, 1.5 bathrooms

Natasha breaks ground.png
Bay Street hole-2.png
Bay Street hole (1).png
Bay Street 2021.05.06.png
Bay Street foundation walls up-2.png
Bay Street foundation-1.png
Bay St - first floor.png
Mary works with volunteer to put togethe
Sheri and Edgar work on a framing sectio
An mini excavator is onsite to assist wi
Hole dug for water and sewer lines at Ba
framing at Bay St-7.png
framing at Bay St-3.png
framing at Bay St-8.png
framing at Bay St-9.png
Image-1.png
Image.png
Image-2.png
Image-3.png
Facebook Post 3.png
Facebook Post 2.png
IMG_1261.jpeg
IMG-1364.jpg
IMG-1330.jpg
Volunteers.jpg
IMG_7039.jpg
file2.jpeg
file1.jpeg
file.jpeg
IMG_5726.jpeg
IMG-1497 (1) PNG.png
IMG-1491 PNG.png
IMG-1504-1 PNG.png
Bay Street has a roof-2.png
Bay Street has a roof.png
Sheri levels and smoothes newly poured concrete basement floor at Bay St.png
Bay Street basement.png
Bay Street framing rooms.png
Bay Street framing interior rooms.png
Bay Street framing interior rooms-1.png
Sheri and Mary discuss logistics of building a closet over staircase.png
volunteer Chris Doe.png
Bay Street gets windows.png
Bay Street gets windows-1.png
Bay Street gets windows-2.png
Kevin electrical work at Bay Street - hooking up the wires for service.png
Sweeping up the dust before applying the primer for the leveling material.png
Primer being rolled on basement floor to prepare for the leveling the floor.png
Volunteers manuevering in the one-piece shower stall.png
Installing exterior door.png
Construction team member Mary instructs volunteer on how to shim in a door.png
Weed whacking the outside fence to beautify the property.png
vinyl siding is going up at Bay Street.png
OMG2.png
UMASS drywall-8.png
UMASS drywall-6.png
UMASS drywall-2.png
UMASS drywall.png
Natasha putting up drywall.png
WMTW drywall-1.png
WMTW drywall-5.png
WMTW drywall-6.png
WMTW drywall.png
WMTW drywall-3.png
WMTW drywall-2.png
Edgar taping.png
Violeta taping-1.png
Braulio taping.png
Bay Street 2021.12.28.png

Holyoke, 2 houses
3 bedrooms, 1.5 bathrooms
(Floor plan unavailable)

hole is dug-1.jpeg
Holyoke footing.png
Holyoke foundation.png
Holyoke foundation ready for backfill-2.png
Holyoke foundation ready for backfill.png
Sheri backfilling with shovel.png
Holyoke with stairs.png
Holyoke without stairs.png
Citizens Bank volunteers hammer off the rebar pins used to secure the concrete forms-1.png
Citizens Bank volunteers hammer off the rebar pins used to secure the concrete forms-3.png
Citizens Bank volunteers hammer off the rebar pins used to secure the concrete forms.png
Citizens Bank volunteers work together to prep and install the sill seal and sill plate to
Citizens Bank volunteers work together to prep and install the sill seal and sill plate to
Holyoke first floors.png
Adam of OMG pays close attention to selecting the right pieces of lumber for wall construc
OMG President and CEO Hubert McGovern carries 2x6 lengths of wall framing to be constructe
Constructed wall section is raised and positioned into place by the team.png
OMG team members hold sheathing in place while it's being secured by other crew members (1
Team members prepare to construct the 4th wall of the first story of our new home in Holyo
Laurie after finishing the last second floor joist.png
HHA crew framing.png
HHA men with beams.png
HHA man with drill.png
HHA woman with drill.png
HHA having some fun on build site.png
Holyoke Lempke-2.png